IntroductionTest VehicleConstruction CyclesDatabasesAnalysis & Design SoftwareDocuments

Construction Cycle Five (CC-5)

Strain Gage: Asphalt

Construction Cycle Five consists of two separate configurations.  Select a test below to see detailed information and query its data.

Test Strip

The purpose of CC-5 Test Strip was to provide a flexible pavement with which the adequacy of DuPont Clay, for use as stable low strength subgrade material, could be determined. 

Test Items

The purpose of CC-5 Test Items  was to provide a flexible pavement with which the interaction effects on pavement performance provided by closely spaced multiple-wheel landing gears could be determined.