Phase I CC4 Baseline Test

Phase I: CC4 Baseline Test (July - October 2006)

Full-scale test of PCC overlays on new (undamaged) rigid pavements.

 

1. Test Objective 6. Material Characterization Plan & Data
2. Test Plan 7. Material Testing Reports

2a. Gear Configuration

8. Painting Plan

2b. Wheel Load/Tire Pressure

9. Pavement Distress map (Concrete)

2c. Wander Pattern

10. Post Traffic Testing
3. Pavement Construction/Cross Section      10a. HWD                     
4. Instrumentation Plan 11. Search the CC4 Database (Phase I)
5. NDT Plan & Data