The CC7 South test area was designated as the Overload Test and consisted of six test items 40 feet long and 33 feet wide with six 10-foot transition areas between Stations 0+00 and 3+00.  These six test items were constructed with a clay subgrade material with a design CBR of 5, a 20-inch thick layer of P-154 subbase, a 6-inch layer of P-209 aggregate base and a 3-inch thick surface layer of P-401 asphalt. These test items were designed using FAARFIELD.  The pavement structure is shown in the figure below.


CC7 South Pavement Structure

 

Click here to download the CC7 As-built construction plan.

Click here to download the CC7 As-built instrumentation plan.

 