Construction Cycle 4

Construction Cycle 4 (CC4)

The primary objective was to improve the understanding of the influence of design parameters on unbonded concrete overlays of rigid airfield pavements, thus enabling improvement of FAA design methods.

CC4 construction, testing, and results in the form of webpages, photographs, reports, and databases can be found in the table below.

Construction

Material Characterization

Subgrade

P-154 Aggregate Base

PCC

HMA Interlayer

Pavement Construction/Cross Section

Phase 1 Baseline Test

Phase 2 SCI Validation Test 

Instrumentation Plan

Phase 1 Baseline Test

Phase 2 SCI Validation Test

Painting Plan

Phase 1 Baseline Test

 

Rigid Overlay Test Items

Construction Cycle Four (CC-4) was an initiative of The Innovative Pavement Research Foundation (IPRF), under a Cooperative Agreement with the FAA. It was undertaken to improve the understanding of the influence of design parameters on unbonded concrete overlays of rigid airfield pavements, thus enabling improvement of FAA design methods. CC4 consisted of two separate components.  Select a test below to see detailed information and search the data.

Phase I: CC4 Baseline Test (July - October 2006)

Full-scale test of PCC overlays on new (undamaged) rigid pavements


IPRF 04-02 Final Report.

 

Phase II: CC4 SCI Validation Test (October - April 2008)

Full-scale test of PCC overlays on damaged rigid pavements.

IPRF 06-03 Final Report.