Construction Cycle 3 (CC3) Flexible Test Items

 

The main objective of Construction Cycle 3 (CC-3) was to provide full-scale test data to improve FAA thickness design procedures for flexible pavements supporting 4-wheel and 6-wheel aircraft gears. A second major objective was to use the comparative performance data for 4- and 6-wheel gear traffic from these tests to validate new alpha factors for 4- and 6-wheel gear airplanes in the ACN-PCN method.

 

After completion of the initial traffic testing phase (Phase 1), additional tests were performed on the used test items to satisfy various supplemental objectives:

 

 

 

    • Measure wheel load interaction for 4- and 6-wheel gears
    • Video recording of the pattern of failure of a flexible pavement structure being rapidly failed; and
    • Compare the number of load repetitions to failure for the same structure with and without wander. 

 

CC3 Pavement Construction / Cross-Section

Construction Cycle 3 (CC-3) involved the replacement of existing CC-1 test items and an existing Portland cement concrete (PCC) test strip with a series of four new flexible pavement sections with varying subbase thicknesses:

 

    • LFC-1: Flexible surface layer with 16-inch P-154 unbound aggregate subbase.
    • LFC-2: Flexible surface layer with 24-inch P-154 unbound aggregate subbase.
    • LFC-3: Flexible surface layer with 34-inch P-154 unbound aggregate subbase.
    • LFC-4: Flexible surface layer with 43-inch P-154 unbound aggregate subbase.

 

CC3 IMG1 ACTUAL

For more information on the CC3 Experiment click on one of the links in the table below.

Construction

  1. Material Characterization Plan & Data

  2. Pavement Construction/Cross Section

  3. Instrumentation Plan

Traffic Testing

  1. Overview

  2. Aircraft Loading and Gear Configuration

  3. Wander Pattern

  4. NDT Procedure and Data

  5. Traffic Testing Results and Analysis

 

Post-Traffic Testing

  1. Trenching Plan

  2. Trench Field Testing 

Click Here to Search CC3 Database

Post-Traffic Report – Field Testing

Access the post-traffic report here.