Construction Cycle 4

Construction Cycle 4 (CC4)

 

CC4 construction, testing, and results in the form of webpages, photographs, reports, and databases can be found in the table below.

Construction

Material Characterization

Subgrade

P-154M Subbase

P-306MR Lean Concrete Base Course

P-404MR Bituminous Bondbreaker

P-501MR Portland Cement Concrete (PCC) Surface Course

Pavement Construction/Cross Section

Phase 1 Baseline Test

Phase 2 SCI Validation Test 

Instrumentation Plan

Phase 1 Baseline Test

Phase 2 SCI Validation Test

Painting Plan

Phase 1 Baseline Test

Phase 2 SCI Validation Test

Download CC4 - Construction Report

Download CC4 - As-Built Drawings

Construction Photographs

 

Traffic Testing

Test Objective

Phase 1 Baseline Test

Phase 2 SCI Validation Test

Phase 1 Overload Traffic Test

Gear Configuration

Pre Trafficking

Full Scale Trafficking

Wander Pattern

Pavement Monitoring

Phase 2 SCI Validation Test

Gear Configuration

Pre Trafficking

Full Scale Trafficking

Wander Pattern

Pavement Monitoring

Daily Notes

Phase 1  Baseline Test

Phase 2 SCI Validation Test

Traffic Testing Photographs

 

Results & Analysis

Traffic Test Results & Analysis

Phase 1  Baseline Test (Download Comprehensive Report)

Phase 2 SCI Validation Test (Download Comprehensive Report)

Post Traffic Test Results & Analysis

Nondestructive Testing

Nondestructive Testing Data

Databases

Phase 1 Baseline Test Database

Phase 2 SCI Validation Database

 

Rigid Overlay Test Items

Construction Cycle Four (CC-4) was an initiative of The Innovative Pavement Research Foundation (IPRF), under a Cooperative Agreement with the FAA. It was undertaken to improve the understanding of the influence of design parameters on unbonded concrete overlays of rigid airfield pavements, thus enabling improvement of FAA design methods. CC4 consisted of two separate components.  Select a test below to see detailed information and search the data.

Phase I: CC4 Baseline Test (July - October 2006)

Full-scale test of PCC overlays on new (undamaged) rigid pavements


IPRF 04-02 Final Report.

 

Phase II: CC4 SCI Validation Test (October - April 2008)

Full-scale test of PCC overlays on damaged rigid pavements.

IPRF 06-03 Final Report.